Tuesday, November 3, 2026

Foundation Prep

I cannot underscore the skill of the excavation and plumbing teams. The equipment is like an extension of their arms. 

If you need think kind of work - call Paramount!




Plumbing connection was easy peasy!!!

Plumbing progress

Sewer connection - done

Water connection - done

Trench from the house to ADU - 90% complete

This is a big deal for an older house. Our cast iron plumbing hasn’t see the light of day for 126 years and it looks good! Quality work back in the day! 

Look how near the hole is for new plumbing. 

We asked the plumber if we should flush out the sewer pipes or take a peek at the water line outside. He said, “If it’s working, don’t look for problems. If the systems are working - leave them alone!”

Yes Sir!

Now onto inspections!



STOP: Soil Test

When you are building in Alexandria, ALWAYS order a soil report. Even if you are told it’s not needed. Order it anyway.

We were ready for the inspection of the ADU footers before concrete prep started and we had to stop to check the soil. The City recommended a local company and they scheduled us within 2 days so this should be a very short delay.

Why? Alexandria is built on marine clay and that isn’t idea for stable structures. Marine clay does not absorb water well had has a lot of movement. Our reno was ok and the clay was strong enough for our house and addition without extra reinforcement. 

Initial reviews by the soil engineers look good - they dug 11ft and no water! Now we wait for the report to see if we need to make the footers deeper or add additional supports.



Wednesday, October 28, 2026

Clean Slate

 Now it’s time to start anew! The yard looks so big - for now!




Plumbing Talents

 Now the hard part! Connecting 1910 plumbing system to a new ADU! We hired the best - BrownLee plumbing to tackle this part of the job.

He calculated the drop as he walked the property. Send pristine plumbing thoughts as he digs up the old and connects the new in very small spaces!





DEMO DAY

 Dan and I watched our old garage disappear in a matter of moments.

There were so many memories packed into the small space!

  • Holiday Card Lane Workshop: The site for hundreds of holiday cards IG @holidaycardlanealex
  • Home for so many gardening tools!
  • Projects galore from new porches, Odyssey of the Mind creations, Scouting things
  • Chip was lost in a snow storm - he was locked in the garage!
  • Blaze hanging out during his walkabout
  • Wayne Street Party location
  • John’s Citizenship Party
  • So many birthday parties!







Saturday, October 24, 2026

Before

Demo day is coming....this is where we started 

Video of the inside before

New Garage

After researching over 40 options with costs from $20k junk to $500k custom, a contractor recommended looking at Amish built garages as a base and finishing it. That was the perfect option for our project. A local company had a catalog of buildings and we bought a single car garage with a loft. We added a bigger dormer and swapped out the garage door for an entry door.

The company created a package for our project that included:
-building
-demo and haul away
-regrade the yard
-pour concrete slab for new building 
-delivery and setup 

We will hire experts to finish the building as will a health dose or DIY
-plumbing (connect to our house)
-electrical (connected to our house)
-insulation and drywall 
-flooring
-kitchen
-bathroom

Paperwork

ADU standards are evolving and there are so many tiny house, ADU, Casita, Bunkies and kits that add more variables for the design and review process.

Dan and Theo spent hours pouring over every detail from livibility to safety and everything in between. 

Design with Designers

Constraints can spark creativity and make projects VERY HARD!

Our lot is on a corner. This is one of our favorite features of our house - until you want to add an ADU. Now we have 2 front yards and more setback requirements: (   Codes have changed since 1910 so what we have with our current garage doesn't work today. 

Scale: we wanted the ADU to look similar to the original garage and look like it belonged to our house instead of a overpowering addition.

Ideas: So many ideas and so many options for structure from trailers to custom built. 

Garage 2.0 - ADU

After 2 years of planning and 10 months of permit ping pong, we are ready to start a new project. 

Saturday, August 28, 2010

Pictures are going up now - thank you Lili

Dining room






























Kitchen















upstairs bathroom

Friday, August 27, 2010

Cabinet doors - check

Only a few things left until the project is 100% complete. We had a pre-housewarming today with a happy hours for Dan's office. It was fun to have guest over again.

Looking good....better when a shelf is adjusted to fit taller items.

Kitchen before:

















Kitchen After:

















Family area before:






Family area after:
















View of the back before:






View of the back after:





Thursday, August 12, 2010

Living room - partial disaster

Yes Mom, we are making progress on the living room - it's just slow.

Paint is almost complete and we're trying to sort through the last 10 boxes. They are the hardest because they are books!

Why rush? We don't have any furniture for this room and won't for awhile! I guess it will be a good place to set up matchbox car races or dancing area.

We have LIGHTS - more of them

At last we have real lights in the upstairs bathroom. We can retire our camping light and check off a few more items from the punch list.


















Stair lighting to guide John's visits at 2:31 am (when we return him to his room)


















Back door light

Wednesday, July 21, 2010

Living Room - disaster!

This is not pretty - we've created a quarentine area in the LR to try to keep what we *really* need. The rest will head to the front porch for a visit from Craigslist or Goodwill!
















Our dining room is an oasis! Just a few changes made the room 1000% better. While we love our new big spaces (kitchen & gather space) we really love the improvements to our original cozy spaces (DR, loft, upstairs BA, Master BR & BA)


Cabinet hardware
















Still waiting for cabinet doors for the uppers shelves and need the spacing of a few shelves adjusted.

It's amazing how many treasures we had stashed away in our tiny house that want to be FREE!

Upstairs bathroom counter top is in

The extra beautiful piece of marble we wanted was not big enough. This one looks darn good!

Thanks again Dad for funding this bathroom : )















Yes, there will be tile along the back splash area


Tuesday, July 13, 2010

We're slowly unpacking as the construction team wraps up. The cats are settling in and have not punished us...yet.

Mom is in love with our dishwasher. We have to put our ear up to the door to see if it is on.

This picture is flipped and I can't fix it...This is a pic of my new spice drawer next to the stove.




















 Josie checking out the new digs